Langan has provided support services
for the St. Johns University Campus Master Plan Study and
the design and construction of the Phase I Master Plan development.
The Master Plan incorporates the following elements: Residence
Halls and Dining Facilities for 3,800 students, Church, Student
Center, Electrical Substation, Admissions Building, Athletic Fields,
Internal Roadways and Parking Garages. Our services have included
site design review and preparation of the site boundary and topographical
survey, which included an inventory and assessment of the existing
site utilities. Infrastructure design included site utility (storm,
sanitary and water) and internal ring road design. Other services
included the preparation of permit documents for application with
the New York City Department of Environmental Protection and construction
phase services. The overall design required coordination and phasing
of the proposed improvements with existing structures and future
phase development, while maintaining the University's daily operations.
Langan continues to develop and implement the campus master plan
with paving, lighting, roadway and landscape improvements