Project Spotlight Tour: Langan Leader, January 2018

Learn more about Langan’s involvement in our featured projects.

Lafayette College – Integrated Science Center – Easton, PA
Armed Forces Retirement Home – Washington, DC
The Morgan School – Clinton, CT
Modera San Pedro Square – San Jose, CA
Lenox Health Greenwich Village – New York, NY
New Brunswick Performing Arts Center – New Brunswick, NJ

Lafayette College – Rockwell Integrated Sciences Center

OVERVIEW
Lafayette College’s approximately 80,000-SF new Integrated Sciences Center is situated on Anderson Courtyard and adjacent to the Acopian Engineering Center. The project meets the US Green Building Council’s LEED Gold Status – one of the highest industry standards for sustainability. Langan was the site/civil consultant for the project and responsible for site feasibility services to evaluate various site configurations, zoning and code implications, as well as providing landscape architecture and planning. Langan was also responsible for the preparation of land development drawings and the submission of these drawings to local, county and state review agencies.

Location
Easton, PA

Client
Lafayette College

Services
Site/Civil
Landscape Architecture

Architect
Payette


Armed Forces Retirement Home

OVERVIEW
The Armed Forces Retirement Home (AFRH) in Northwest Washington, DC is an independent agency that provides residences and other services for military veterans. Hensel Phelps Construction Company provided design-build services for the new Scott Building at the AFRH. Langan was brought on to provide additional geotechnical support during construction associated with demolition and sheeting/shoring activities. We worked with the design-build team to redesign the sheeting and shoring system to fit within contractual limits and allow for ongoing demolition work.

Location
Washington, DC

Client
Armed Forces Retirement Home

Service
Geotechnical

Strategic Partner
Hensel Phelps Construction Company


The Morgan School

OVERVIEW
This project involves the construction of a new 600-student public high school on a previously developed nursery site. The school will be approximately 130,000 SF and feature 300 parking spaces, five athletic fields, and seven tennis courts. The project was subject to floodplain and wetlands permitting. Langan provided multi-disciplined services for the new school, including site/civil, geotechnical, traffic, and landscape architecture.

Location
Clinton, CT

Client
Town of Clinton

Services
Site/Civil
Geotechnical
Traffic & Transportation
Landscape Architecture

Architect
Newman Architects


Modera San Pedro Square

OVERVIEW
Modera San Pedro Square is an infill mixed-use. A surface parking lot and retail space will be demolished to develop the 180,000-SF, 8-story mixed-use building with 201 residential units, 12,000 SF of commercial and retail space, and an integrated four-story parking garage. Langan services include: geotechnical investigation, Environmental Site Assessment, Environmental Site Characterization, soil and groundwater investigations, Soil Management Plan, leaking underground fuel leak investigations, environmental compliance and Stormwater Pollution Prevention Plan (SWPPP).

Location
San Jose, CA

Client
Mill Creek Residential Trust LLC

Services
Environmental
Site/Civil
Geotechnical


Lenox Health Greenwich Village

OVERVIEW
Originally designed in 1964, the landmarked building was formerly home to St. Vincent’s Medical Center. The 160,000-SF building underwent a restoration and adaptive reuse and now serves as Manhattan’s first free standing emergency department. Features for the redesigned structure included the addition of ambulance bays and a separate entrance for patient surgery and other services. Langan’s involvement at the site dates back to its previous ownership by St. Vincent hospital, when we provided environmental, geotechnical and survey services. Our more recent work for Northwell Health consisted of consulting during upfront certification and the city review process, surveying, a review of available building plans, a subsurface evaluation, and day-to-day coordination with the client and the design team.
AWARDS
2017 Lucy G. Moses Preservation Project Award, New York Landmarks Conservancy

Location
New York, NY

Client
Northwell Health (formerly North Shore-LIJ)

Services
Site/Civil
Geotechnical
Surveying/Geospatial

Architect
Perkins Eastman

Strategic Partners
Jones Lang LaSalle
Robert Silman Associates
Bard, Rao + Athanas Consulting
Turner Construction


New Brunswick Performing Arts Center

OVERVIEW
The New Brunswick Performing Arts Center will take the place of the George Street Playhouse and the Crossroads Theatre, which will both be housed in the new building. The new building will be 22 stories high and will host four companies, two theaters, three rehearsal stages and 240 residential apartments. Rutgers University will relocate their Mason Gross School of the Arts to the new arts center. The state-of-the-art design is set to mimic art centers in New York City and others around the country. Langan provided multiple engineering services including survey, site/civil, traffic and landscape architecture.

Location
New Brunswick, NJ

Client
DEVCO

Services
Site/Civil
Surveying/Geospatial
Traffic & Transportation
Landscape Architecture