19Nineteen Clarendon Boulevard
OVERVIEW
Langan was retained to oversee and supervise the removal of two unknown underground fuel oil storage tanks during site development. A characterization investigation followed and a total of 1,373.59-tons of petroleum-contaminated soils were excavated from the site and transported off-site for disposal. Langan is also conducting the monthly testing and monitoring of the on-site dewatering system that was installed after the site investigation.