OVERVIEW
The project at 301 Blair Road consisted of the renovation of an existing warehouse and the reconfiguration of the existing parking lot and truck court. An ecommerce client was the selected tenant for this building, and the site was designed with their site requirements in mind. The project at 275 Omar Avenue consisted of the demolition of a portion of an existing warehouse and the construction of a new warehouse in its existing footprint. Additional site upgrades included improvements to the existing parking lot and truck court. New driveways were constructed to improve car and truck circulation around the site. Langan was able to design the site without proposing any additional stormwater detention systems or costly mechanical treatment devices.