Bay Head Yacht Club

OVERVIEW
The clubhouse's first floor was flooded by recent large storms, including Super Storm Sandy in 2012, and deteriorated piles could no longer be maintained. Renovations included demolition and rebuilding of the eastern portion of the yacht club, installation of new piles, raising the clubhouse approximately 10 feet to minimize future flooding, and replacing both the existing bulkhead on the north side of the building and the wrap-around deck. Langan's engineering services included geotechnical/marine bulkhead investigations, flood load analysis and geotechnical subsurface investigations, and foundation recommendations. Our permitting services included a pre-application meeting and submittal of a Coastal Jurisdictional Determination with the NJ Department of Environmental Protection (NJDEP).