OVERVIEW
Langan helped engineer the redevelopment of the 130-acre former Hercules Burlington Plant, which ceased manufacturing operations in 1992, into four new warehouses totaling 1.69 million SF. The site required environmental remediation and is now capped with processed dredged material (PDM) under the supervision of NJDEP. Approximately 300,000 cubic yards of PDM were used to raise grades necessary for site development. With the help of Langan, a new stormwater management system design enabled preliminary “pad ready” construction to continue after a failed attempt to construct two wet ponds near the Delaware River.