Campbell Soup Company Corporate HQ Demolition
OVERVIEW
Langan was a part of the team joined to revitalize the abandoned, asbestos-filled Campbell Soup Factory. Langan was charged with the evaluation and remediation design of the contamination, the preparation of construction documents for the demolition of over 600,000 square feet using implosion methods, and the design of infrastructure improvements. Of the 150,000 tons of demolition rubble, all except 800 tons were reused at the site, resulting in a $3,000,000 cost savings. Today, a ballpark, amphitheater, office buildings and aquarium occupy this site.