JFK Middle School

OVERVIEW
This $84-million project includes the 180,000-SF renovation of the middle school and a 19,000-SF addition that will create a new public entry to the community use spaces. Langan provided a boundary and topographic survey that assisted our engineers with the site design, including site layout, drainage, site utilities, and erosion controls. Our geotechnical team performed a subsurface exploration consisting of borings to explore subsurface soil and groundwater conditions. Langan's landscape architects worked in conjunction with the design team and prepared a set of detailed drawings suitable for permitting and cost estimating purposes, including a planting plan and site lighting plan.