Lambert Bridge Replacement

OVERVIEW
Langan provided geotechnical services for a new 240-foot pre-stressed concrete open spandrel arch spanning Dry Creek to replace a historical pinned through truss bridge. The new bridge will provide two 11-foot lanes with two 3-foot shoulders, replacing the 16-foot wide single lane bridge. We developed foundation recommendations and seismic design parameters in accordance with Caltrans Standards.