Majorsville to Hopedale Pipeline
OVERVIEW
The project consisted of installing 45 miles of ten-inch diameter pipe connecting MarkWest's Majorsville, West Virginia processing plant to a fractionator line in Hopedale, Ohio. The majority of the pipeline was installed using open-trench methods; HDD method was used to install the pipeline at four crossing locations. Langan developed, coordinated and implemented geotechnical investigations, performed trenchless feasibility analyses and designs, and prepared bid packages for various crossings.