New Canaan Library

OVERVIEW
The New Canaan Library project team committed to developing an energy efficient building with a low carbon footprint, and agreed to an initiative to track building materials and guarantee their production does not include use of forced labor. Langan provided general site layout, grading, and consulting for vehicular pavement areas; developed the stormwater management approach; and conducted a boundary and topographic survey, Phase I Environmental Site Assessments, soil characterization sampling, groundwater sampling and permitting, field investigations, and construction administration. We also provided a traffic assessment with options for on-site and off-site parking, and designed a raised pedestrian crosswalk with rectangular rapid flashing beacons and CTDOT encroachment permitting.