NJ Meadowlands Commission 1-A Landfill Solar Array

OVERVIEW
The solar array will be constructed on the top of the landfill and down the southern slope of the New Jersey Meadowlands Commission (NJMC) 1-A Landfill, with an intertie connection to the regional electrical distribution located off the site. The solar array is expected to provide over 3 MWdc of electric solar power annually. Langan has been retained by SunDurance to assist in a variety of design, permitting, and construction needs.