Studio Developments

Langan understands the unique challenges clients face when designing and constructing studio developments.  Our team strives to provide the best possible solutions to meet the client and development teams goals throughout the project. 

R.I.P.D. Productions – Universal Pictures

OVERVIEW
Langan provided an environmental assessment and stabilization oversight services for a former warehouse to be used as part of filming activities for a major motion picture studio. During the first phase of the project, Langan conducted a site inspection to determine potential hazards for the cast and crew of the film. Langan performed aggressive air sampling for dust, lead and asbestos; sampled bulk materials within the warehouse for asbestos; and collected wipe samples for potentially PCB-containing oils.

Location
East Boston, MA

Client
Universal Pictures

Service
Environmental


Pixar Animations Studio

OVERVIEW
Langan provided geotechnical consultation services during the design and construction of Phase I of the Pixar Animation Studios campus. The project consists of a large two-story, base-isolated building, surface parking, and extensive landscaped recreational areas. We also evaluated the planned Phase 2 site during construction which included additional buildings and a new parking structure. Our services consisted of due diligence studies, geotechnical investigations, seismic response studies, and construction observation and testing services during demolition and site development.

Location
Emeryville, California

Service
Geotechnical

Architects
Perkins + Will
Allied Works Architects

Strategic Partner
DPR Construction


Silvercup Studios

OVERVIEW
Silvercup Studios is New York’s most iconic film and television production facility, with 23 studios totaling over 500,000 SF. The studios are divided into three categories: North, Main, and East, all of which Langan supported. Sections of the studios were former industrial warehouse/parking site was previously developed with a manufactured gas plant and filling station, and were part of the NYS Department of Environmental Conservation (NYSDEC) Brownfield Cleanup Program.

Langan prepared and implemented environmental and geotechnical investigations, and designed remedial measures to clean up the site for future development. Langan designed a new bulkhead along the shoreline (about 500 linear feet) to support future development and to serve as containment barriers to prevent contamination migration. We conducted a Phase I ESA and Phase II ESI at the site. Under the Phase I ESA, Langan reviewed agency databases, historical records, and prior ownership and uses of the site. We also performed a site inspection, including the surrounding properties.

Location
Bronx & Long Island City, NY

Client
Silvercup Properties

Services
Site/Civil
Geotechnical
Environmental
Surveying/Geospatial


Brooklyn Navy Yard – Steiner Studios

OVERVIEW
Langan provided a wide range of services to Steiner Studios on the construction of their 285,000-SF studio in Brooklyn Navy Yard. The 15-acre site was redeveloped with new roadways, parking for over 800 cars and rehabilitation/replacement of the existing infrastructure network. Langan's design included detailed assessment of the existing water and sewer networks, design of water and sewer repairs or new installation where appropriate; modifications to the existing traffic signal intersections at the site perimeter, and design of new internal roadways, site design of the parking lot and around the studio building.

Location
Brooklyn, NY

Client
Steiner Equities Group, LLC

Services
Site/Civil
Geotechnical
Environmental
Landscape Architecture