Bay Area Office Campus Projects

Dear Scott,

Here are a few office projects that Langan has completed. I hope this is helpful! Please contact me with any questions.

Vitina Mandella, Senior Project Manager

LANGAN

408.283.3612

vmandella@langan.com

 

Bayshore Technology Park

OVERVIEW
The one million-square foot Bayshore Technology Park exemplifies Langan's expertise with landfill redevelopment and the integration of our core engineering disciplines: site/civil, geotechnical, and environmental. We provide engineering design, permitting and bid/construction administration support for various site improvement projects throughout the campus. These site improvements support the flexibility and growth of the Park, which touts amenities that go beyond office space: fitness facilities, basketball courts, walking trails, and a Cal Train shuttle, among other amenities.

Location
Redwood City, CA

Clients
PGIM (formerly Prudential)
Harvest Properties

Services
Site/Civil
Geotechnical
Environmental
Traditional Surveying


Texas Instruments Corporation

OVERVIEW
Langan has worked on various Texas Instruments Corporation sites managing groundwater monitoring programs, designing and implementing remedial programs and working with regulatory agencies towards site closures.

Location
Palo Alto & Santa Clara, CA, & Puyallup, WA

Client
Texas Instruments Corporation

Services
Environmental
Site/Civil


Equinix Data Centers

OVERVIEW
Langan is providing multidiscipline services during construction of the Equinix SV10 development, a multi-phased project consisting of two data centers on the 11.5-acre site. The new data center buildings will house computer servers and supporting equipment for private clients, as well as associated office uses, in environmentally controlled structures.

Location
San Jose, CA

Clients
Equinix, Inc.
J.T. Magen & Company Inc.

Services
Site/Civil
Geotechnical
Environmental


Britannia Cove at Oyster Point

OVERVIEW
Britannia Cove at Oyster Point is a massive biotechnology business complex consisting of 884,000-SF of office buildings, 20,000-SF of retail space, a hotel, and 6-story and 2-story parking structures. Located along the Bay, the site is underlain by fill and soft clay (Bay Mud). Part of Langan's scope of services included using geophysical methods to detect where foundations and railroad ties from former site uses were buried underground.

Location
South San Francisco, California

Client
Project Management Advisors, Inc.

Service
Geotechnical

Architect
DES Architects + Engineers and HCP


The Exchange

OVERVIEW
The Exchange reflects urban life and the Mission Bay’s rapid revitalization. Targeted for LEED Platinum certification, the estimated $485-million development will provide 680,000 SF of office space and parking in four interconnected buildings (two 7-story and two 12-story buildings). Designed for today’s workforce, The Exchange also offers ground-level retail space, a café, a lobby bike spa, rooftop gardens, and waterfront views. Due to our experience in the Mission Bay area, we were able to help the client select the most efficient and economical foundation system for the project while mitigating potential seismic hazards. Langan also completed an environmental investigation program and prepared a Site Mitigation Plan.

Location
San Francisco, California

Client
Kilroy Realty Corporation

Services
Geotechnical
Earthquake/Seismic
Environmental

Architect
Rios Clementi Hale


Maude & Mathilda R&D Campus – LinkedIn & Apple

OVERVIEW
Maude & Mathilda Research & Development (R&D) office campus is Class A office space that consists of three mid-rise buildings, an amenities building, and a five-level parking garage. Apple and LinkedIn occupy the 560,000 SF campus. Langan worked with the project team to evaluate options to mitigate potential volatile organic compound (VOC) vapor intrusion conditions for the site development, and to prepare design documents for the selected remedies.

Location
Sunnyvale, CA

Client
Kilroy Realty Corporation

Services
Environmental
Geotechnical


Lincoln Centre Life Sciences Research Campus

OVERVIEW
Located on the Peninsula, Lincoln Centre is a 595,000-SF biomedical and life sciences research campus redevelopment. The buildings of the former industrial park were demolished. The development now includes three office/laboratory buildings, three parking structures, and an amenities building. Langan performed a geotechnical investigation and site-specific seismic studies, updated the Phase I Environmental Site Assessment, conducted a Limited Environmental Site Characterization, and provided construction observation and analytical testing services.

Location
Foster City, CA

Client
BioMed Realty

Services
Geotechnical
Environmental
Earthquake/Seismic

Architect
HOK


Visa Metro Center

OVERVIEW
Langan provided geotechnical services for the design and construction of VISA's West Coast headquarters in Foster City. The project consisted of two 12-story office towers and adjacent 4-story parking structures. Foundations for the buildings include 125-foot-long, 14-inch-square, reinforced concrete piles designed for allowable loads of 130 tons. The piles extend through 50 to 60 feet of man-made fill and weak marine deposits, taking support in stiff clay and dense sand at depth.

Location
Foster City, CA

Client
VISA USA

Service
Geotechnical


Adobe Systems Tower

Langan performed geotechnical investigations for Adobe System’s third tower in San Jose. Langan developed geotechnical conclusions and recommendations and provided recommendations for a mat foundation, as well as shoring and underpinning recommendations for the adjacent properties. Our team also developed earthquake design criteria and site-specific design spectra. 

Location
San Jose, California

Client
Randy Knox

Services
Geotechnical
Earthquake/Seismic


Salesforce Tower

The new Salesforce Tower is the tallest building in San Francisco’s stunning skyline.  This 1.4 million SF, 60-story high-rise office building contains two to four levels of below-grade parking and many sustainability features. The tower will connect directly to the new Transbay Transit Center and will be linked to a large public park with ample recreational and green space.

 Langan’s environmental team is providing consulting services for this project, including soil and groundwater sampling, Site Mitigation Plan, oversight during excavation activities, project management, sampling and chemical analysis during soil handling and disposal activities.

Location
San Francisco, California

Clients
Boston Properties
Hines

Service
Environmental

Architects
Pelli Clarke Pelli Architects
Kendall/Heaton Associates

Strategic Partners
Magnusson Klemencic Associates
Clark Construction


5000 Shoreline

OVERVIEW
Langan developed repair plans for the site around the existing building to mitigate differential settlement. The existing building, currently occupied by Actelion Pharmaceuticals and managed by Jones Lang LaSalle, was constructed over ten years ago on the Sierra Point Landfill. The site experienced significant settlement relative to the pile-supported building resulting in the need for site improvements. Langan also worked with the owner to address concerns on the operation of the existing methane mitigation system.

Location
South San Francisco, California

Clients
Actelion Pharmaceuticals
Jones Lang LaSalle

Services
Site/Civil
Environmental


Oracle

OVERVIEW
Langan performed a geotechnical investigation for the Oracle Headquarters and the adjacent Island Parkway Campus. Langan developed foundation design criteria for several office buildings, a recreation center, conference center, pedestrian bridge, and four parking structures.

Location
Redwood City, CA

Client
Oracle

Service
Geotechnical

Architects
Gensler
KSH Architects

Strategic Partners
Nishkian Menninger
Webcor