Langan Demolition

Since Langan’s earliest days, we recognized that demolition is an important component in the overall site design process. Accordingly, we embrace a comprehensive design approach that integrates opportunities for cost and schedule savings during the demolition to avoid duplicating activities during the construction phases. For example, reusing concrete/masonry material as backfill and selective foundation removal to accommodate new foundations and utilities saves on material disposal costs and avoids unnecessary excavation – each also resulting in time savings.  The firm’s long list of engineering excellence awards indicates our unique expertise in this area. We have worked on projects from razing single-family homes to mid-rise buildings in urban areas to complex, hundred-plus acre sites with millions of square feet of building demolition and salvage operations.

 

 

Giants Stadium Demolition

OVERVIEW
This project involved the demolition of the existing Giants Stadium, which was an 80,242-seat open-air stadium originally constructed in 1976. The project was challenged by poor subsurface conditions, numerous existing site utilities within the existing stadium footprint, presence of asbestos and hazardous materials within the stadium, proximity to the recently constructed MetLife Stadium, and the need to demolish the existing stadium while operating the new stadium and utility infrastructure that serves the Meadowlands Sports Complex.

Location
East Rutherford, NJ

Client
New Meadowlands Stadium Company, LLC

Services
Demolition
Site/Civil
Environmental
Geotechnical


Colgate-Palmolive Plant Demolition

OVERVIEW
The Colgate-Palmolive Plant site encompasses approximately 6.5 hectares and contains 18 interconnected buildings, varying from one to six stories in height and totaling 1,325,000 square feet. The site also includes tank farms, silos, a wastewater plant, a 30-meter smokestack, an elevated water tank, and an abandoned rail line. Langan provided site observation and recommendations to improve the demolition efficiency and operations, specifically during the building and smokestack demolition.

Location
Mexico City, Mexico

Client
Colgate-Palmolive

Services
Demolition
Site/Civil


Campbell Soup Company Corporate HQ Demolition

OVERVIEW
Langan was a part of the team joined to revitalize the abandoned, asbestos-filled Campbell Soup Factory. Langan was charged with the evaluation and remediation design of the contamination, the preparation of construction documents for the demolition of over 600,000 square feet using implosion methods, and the design of infrastructure improvements. Of the 150,000 tons of demolition rubble, all except 800 tons were reused at the site, resulting in a $3,000,000 cost savings. Today, a ballpark, amphitheater, office buildings and aquarium occupy this site.

Location
Camden, NJ

Clients
Campbell Soup Company
New Jersey Economic Development Authority

Services
Demolition
Site/Civil
Geotechnical
Environmental
Natural Resources & Permitting


19th Century Scovill Brass Factory

OVERVIEW
The long-defunct brass manufacturing center, once 90+ decaying buildings on a 100-acre downtown site, was prepared for a rebirth. Langan's value engineering and effective construction management saved the client over $9.5 million.

Location
Waterbury, CT

Client
Brass Center Ltd.

Services
Environmental
Geotechnical


Civic Arena Demolition

OVERVIEW
Langan, an expert on demolition operations, was hired to prepare documents and provide bidding assistance and oversight services for the planned demolition of the Civic Arena (formerly the Civic Auditorium and Mellon Arena), as part of a public bid solicitation process. The 130,000-square-foot, 17,000-seat arena, built in 1961 and nicknamed “The Igloo,” was the former home of the Pittsburgh Penguins NHL hockey team and has a unique retractable roof.

Location
Pittsburgh, PA

Client
Sports and Exhibition Authority of Pittsburgh and Allegheny County

Services
Demolition
Site/Civil
Traditional Surveying


Goldwater Hospital Demolition

OVERVIEW
The project consisted of the demolition of Goldwater Hospital, which is located near the southern end of Roosevelt Island, south of the Queensboro Bridge and north of Four Freedoms Park. The 12.5-acre site includes seven main buildings with interconnected corridors (215,000 SF), asphalt parking lots, and open space areas. Langan provided demolition engineering and regulatory permitting services, demolition documents consisting of drawings and specifications, and assisted the owner and contractor in preparation of the Stormwater Pollution Prevention Plan for the demolition work. One significant project challenge included coordinating only one single point of access to Roosevelt Island, which created difficulty for the removal of demolition debris and other materials from the site.

Location
Roosevelt Island, NY

Client
Cornell Tech

Services
Demolition
Site/Civil


Mercer County Detention Center

OVERVIEW
The detention center and parking garage were demolished to prepare for the future construction of a new multi-story, LEED certified courthouse. Langan completed and submitted an environmental and hazardous substances assessment report, prepared the environmental and demolition bid plans and specifications, completed environmental testing and monitoring for the removal of the UST, and provided engineering services during the demolition activities. Langan performed demolition engineering services for the detention center and parking garage, which totaled approximately 300,000 SF.

Location
Trenton, NJ

Client
Mercer County Improvement Authority

Service
Demolition


Clorox Plant Demolition

OVERVIEW
The Clorox Paulsboro Plant is located on a 10-acre site currently occupied by a one-story, 89,500-SF warehouse building and the concrete building floor slab of a previously demolished building. The site also consists of a water tower, tank farm, and other small ancillary structures. Langan provided comprehensive demolition and asbestos/ hazmat consulting services, environmental engineering and surveying services for this project. The project presented challenges because of its proximity to the Mantua Creek, on-going environmental remediation and the expedited demolition schedule.

Location
Paulsboro, NJ

Client
Clorox Services Company

Services
Demolition
Site/Civil
Environmental


Andrews Air Force Base Demolition – Buildings 1535 and 1513

OVERVIEW
Langan provided design-build engineering services for demolition of the old headquarters building at Andrews Air Force Base. The project included hazardous material abatement and demolition of the 350,000-square-foot headquarters building and 7,000-square-foot boiler building. After the demolition phase is completed, the project sites will be converted into landscaped parks.

Location
Andrews Air Force Base, MD

Client
ECC

Services
Demolition
Site/Civil
Environmental
Traditional Surveying


Former Swiss Bank Corporation Regional Headquarters

OVERVIEW
The former Swiss Bank Corporation's 1.2 million SF regional headquarters (now UBS headquarters) covers 12 acres and four city blocks in Downtown Stamford. This repositioning project involved the demolition of 20 existing structures, and Langan was responsible for performing a subsurface investigation, site remediation activities, and demolition support.
AWARDS
American Council of Engineering Companies, New Jersey, Engineering Excellence Award

Location
Stamford, CT

Client
Swiss Bank Corporation

Services
Environmental
Geotechnical


Sears Distribution Center Demolition

OVERVIEW
Located in North Philadelphia, the massive Sears Distribution Catalog Center was scheduled to be demolished as part of a large-scale redevelopment project. Langan was retained to identify and assess asbestos containing materials (ACM) and lead-based paint (LBP) within the 3.4-million-SF facility. Langan designed and prepared abatement documents for the facility as well as performed monitoring of asbestos abatement activities.

Location
Philadelphia, PA

Client
The Rubin Organization, Inc.

Service
Demolition


Camden County State Prison

OVERVIEW
Langan provided demolition engineering services for the Camden State Prison. Langan completed and submitted an environmental and hazardous substances assessment report, prepared the environmental and demolition bid plans and specifications, and completed environmental testing and monitoring for the abatement of asbestos containing material. Additionally, we provided LSRP oversight for the removal of the UST and related piping, provided utility location services, and provided engineering services during the demolition activities. The prison was located in an urban environment, adjacent to Rutgers University, commercial and residential properties and on the Delaware River waterfront. During demolition activities Langan worked with the NJEDA and the contractor to monitor and minimize impacts to the surrounding area from dust and debris.

Location
Camden, NJ

Client
New Jersey Economic Development Authority (NJEDA)

Service
Demolition


John A. Delaney Homes Demolition

OVERVIEW
Langan provided the Perth Amboy Housing Authority comprehensive engineering and environmental consulting services for the demolition of 20 two-story apartment buildings. Langan's responsibilities included investigation for asbestos, lead-based paint and universal waste inspection; developing technical specifications and contract drawings for demolition; preparing cost estimates, reviewing contractor bids and providing inspection throughout the abatement; and demolition of the two-story buildings. Langan was also instrumental in obtaining local and state approvals associated with the demolition, which included Planning Board approval and obtaining the Freehold Soil Conservation District – Soil Erosion and Sediment Control Permit.

Location
Perth Amboy, NJ

Client
Perth Amboy Housing Authority

Service
Demolition


Kretchmer Homes

OVERVIEW
Langan assisted the Newark Housing Authority in the demolition and redevelopment of its Kretchmer Homes Housing Project. Langan's responsibilities included assessing alternative methods of demolition and cost benefits of each, developing technical specifications and contract drawings for demolition, preparing cost estimates, reviewing contractor bids and providing inspection throughout the demolition of the five 8-story buildings. Langan also provided site/civil and geotechnical engineering and surveying services for the townhouse redevelopment on this project site.

Location
Newark, NJ

Client
Newark Housing Authority

Services
Demolition
Site/Civil
Geotechnical
Surveying/Geospatial


Curries Woods Demolition

OVERVIEW
Langan assisted the Jersey City Housing Authority in the redevelopment of its Curries Woods Housing Project. Langan's responsibilities included assessing alternative methods of demolition and cost benefits of each, developing technical specifications and contract drawings for demolition, preparing cost estimates, reviewing contractor bids, environmental compliance with regard to underground storage tank removals and reporting and providing inspection throughout the demolition operations. Langan also developed seismographic vibration monitoring criteria and specifications to monitor and limit the effects of demolition on a 12-foot-diameter tunnel located beneath the buildings.

Location
Jersey City, NJ

Client
Jersey City Housing Authority

Services
Demolition
Earthquake/Seismic


John E. Sofield Apartments Demolition

OVERVIEW
Langan provided complete engineering and environmental consulting services for the demolition of an 8-story apartment building. Work included: investigation for asbestos, lead-based paint and an 8,000-gallon underground storage tank (UST); preparation of specifications and contract documents for demolition, asbestos abatement (Subchapter 8) and UST removal; bidding coordination and assistance; construction oversight for UST removal; full-time monitoring of abatement activities; demolition and backfill inspection; and preparation of final UST closure and asbestos abatement reports.

Location
Perth Amboy, NJ

Client
Perth Amboy Housing Authority

Service
Demolition


Langan Demolition