Silvery Towers

OVERVIEW
Silvery Towers is a residential development in downtown San Jose. The project features two towers, 22 and 20 stories, above three basement levels, offering retail and residential space, including 643 apartment units and associated parking. The three basement levels required excavation of 34 to 38 feet below street grade. Langan provided multi-disciplinary engineering services for design and construction of the project. Data from the geotechnical investigation was used to reduce field exploration costs. We performed field observation and provided weekly reports regarding stormwater compliance per the Storm Water Pollution Prevention Program (SWPPP).

Location
San Jose, California

Client
Full Power Properties, LLC

Services
Site/Civil
Environmental
Geotechnical


3877 El Camino

OVERVIEW
Plans for 3877 El Camino are to develop a mixed-use podium-style building with 11,000 SF of retail space, 17 residential units, and an underground garage. As the site/civil engineer, Langan provided site layout, grading, and utility and stormwater management design services. Working with the City of Palo Alto's utility and stormwater departments, we coordinated off-site infrastructure upgrades and designs to meet project demands. Part of our scope includes addressing the City of Palo Alto's comments on stormwater hydraulics and hydrology and stormwater treatment. We are implementing an integrated approach — with input from the entire design team — to divert storm waters into biofiltration planters instead of directly into storm drain systems, which was part of the initial design.

Location
Palo Alto, California

Client
Zijin LLC

Service
Site/Civil

Architect
EID Architects


Mountain View at Middlefield (555 West Middlefield)

OVERVIEW
This 7-acre multifamily residential project — including a community center and a park — is an addition to low-density residential buildings built on this 14.5-acre campus. The infill development will create two residential lots with 345 residences, 974 parking spaces, 150,000 SF of open space, and 25,000 SF of residential amenity space. Per an agreement with the City of Mountain View, a 1.48 acre park will be given to the city for a community benefit. The project is pursuing LEED for Homes certification as well as various sustainable measures. Our site/civil team is providing services for a new bike lane, city-owned trail, the site/sidewalk layout, grading of off-site site/sidewalks and at-grade level podium courtyards, drainage, utilities, and stormwater management. Our geotechnical team is evaluating subsurface conditions and potential geologic hazards at the site. while our environmental team completed a Phase I Environmental Site Assessment (ESA).

Location
Mountain View, California

Client
AvalonBay Communities, Inc.

Services
Site/Civil
Geotechnical
Environmental

Architect
BDE Architecture


5000 Shoreline

OVERVIEW
Langan developed repair plans for the site around the existing building to mitigate differential settlement. The existing building, currently occupied by Actelion Pharmaceuticals and managed by Jones Lang LaSalle, was constructed over ten years ago on the Sierra Point Landfill. The site experienced significant settlement relative to the pile-supported building resulting in the need for site improvements. Langan also worked with the owner to address concerns on the operation of the existing methane mitigation system.

Location
South San Francisco, California

Clients
Actelion Pharmaceuticals
Jones Lang LaSalle

Services
Site/Civil
Environmental


Oracle

OVERVIEW
Langan performed a geotechnical investigation for the Oracle Headquarters and the adjacent Island Parkway Campus. Langan developed foundation design criteria for several office buildings, a recreation center, conference center, pedestrian bridge, and four parking structures.

Location
Redwood City, CA

Client
Oracle

Service
Geotechnical

Architects
Gensler
KSH Architects

Strategic Partners
Nishkian Menninger
Webcor


Equinix Data Centers

OVERVIEW
Langan is providing multidiscipline services during construction of the Equinix SV10 development, a multi-phased project consisting of two data centers on the 11.5-acre site. The new data center buildings will house computer servers and supporting equipment for private clients, as well as associated office uses, in environmentally controlled structures.

Location
San Jose, CA

Clients
Equinix, Inc.
J.T. Magen & Company Inc.

Services
Site/Civil
Geotechnical
Environmental


Cadence Campus, Building 10

OVERVIEW
Langan performed a geotechnical investigation for Building 10 on the Cadence Campus. Plans included construction of a steel framed, L-shaped, 5-story office building at grade with a plan area of approximately 40,000 SF. This project also included a 2-story, 84,000 SF steel frame and concrete tilt-up office center and a full athletic facility.

Location
San Jose, California

Client
RMW Architecture & Interiors

Service
Geotechnical

Architect
RMW Architecture & Interiors

Strategic Partner
BuildGroup. Inc


Bayshore Technology Park

OVERVIEW
The one million-square foot Bayshore Technology Park exemplifies Langan's expertise with landfill redevelopment and the integration of our core engineering disciplines: site/civil, geotechnical, and environmental. We provide engineering design, permitting and bid/construction administration support for various site improvement projects throughout the campus. These site improvements support the flexibility and growth of the Park, which touts amenities that go beyond office space: fitness facilities, basketball courts, walking trails, and a Cal Train shuttle, among other amenities.

Location
Redwood City, CA

Clients
PGIM (formerly Prudential)
Harvest Properties

Services
Site/Civil
Geotechnical
Environmental
Traditional Surveying


The Campus @ 3333 Scott Boulevard

OVERVIEW
This 30-acre site was one of the last remaining large-development sites between San Francisco and San Jose. Langan performed geotechnical investigations and provided construction observation and testing services for all phases of this project, which consists of seven office buildings, two parking garages, and an amenities building.

Location
Santa Clara, CA

Client
Menlo Equities

Service
Geotechnical


Related Santa Clara

OVERVIEW
The overall redevelopment site is the 240-acre former Santa Clara all-purpose landfill, and project plans are for a mixed-use development that includes office, hotel, retail, restaurant, entertainment, residential, and parking space. We are providing integrated site/civil, geotechnical, and environmental services for all project phases.

Location
Santa Clara, CA

Clients
Related Urban
City of Santa Clara, California

Services
Site/Civil
Environmental
Geotechnical


Hayward Library & Community Learning Center

OVERVIEW
Langan performed a geotechnical investigation for the City of Hayward Library & Community Learning Center, a 3-story, at-grade structure. The site measures 31,500 SF. We evaluated the site's subsurface conditions and provided conclusions and recommendations for the geotechnical aspects of the project design. During design, we consulted with the project team and reviewed the geotechnical aspects of the project documents. Since construction began in early 2016, our services have included observing over-excavation of undocumented fill beneath the foundation level, checking completed footing excavations, testing compaction of utility trench backfill, and checking building pad subgrade preparation.

Location
Hayward, CA

Client
Noll & Tam Architects

Service
Geotechnical