Engineering and Environmental Services

Since 1970, Langan’s reputation has been forged by providing practical engineering services in New Jersey, from concept through completion.  Our “one-stop-shop” approach of offering numerous services through one firm ensures continuity, constructability, and adherence to projected schedule and budget.

Since 1970, Langan’s reputation has been forged by providing practical engineering services – site/civil, geotechnical, environmental – that bring measurable value to our clients time and time again. 

HQ’d in New Jersey, we employ over 1,200 professionals in New York, Connecticut, Pennsylvania, Massachusetts, Ohio, Virginia, Florida, Colorado, Texas, Arizona,  Washington and California. 

This web tour features some relevant projects in life sciences, high-tech, healthcare, and university campuses.

Bristol Myers Squibb / Celgene

OVERVIEW
As part of the design-build team, Langan provided site/civil, geotechnical, surveying, landscape architecture, and traffic engineering services for this new, five-story office and structured parking facility. Langan evaluated the subsurface conditions and prepared value-engineered design measures to provide cost-effective solutions for the proposed foundation system. Langan’s site design services included work on the 182,000-SF office and structured parking facility with approximately 974 parking spaces, an at-grade parking area consisting of 215 parking spaces, a new traffic signal at the fronting intersection to the campus, and a 50-foot-high retaining wall surrounding the perimeter of the building.

Location
Summit, NJ

Client
Bristol Myers Squibb / Celgene Corporation

Services
Site/Civil
Geotechnical
Traffic & Transportation
Landscape Architecture
Surveying/Geospatial

Architect
Highland Associates

Strategic Partner
Turner Construction Company


Novartis Pharmaceuticals – East Campus

OVERVIEW
The East Hanover Campus of Novartis Pharmaceuticals is made up of office buildings, laboratories, storage facilities, dining facilities and recreational facilities. Over the past 5 years Novartis has redeveloped the eastern portion of their campus. Improvements include new office buildings, a parking garage, landscaping of a promenade and environmental remediation. Langan provided services throughout this redevelopment process in association with the construction of two 29,430-SF office buildings and a 61,700-SF parking garage, including site/civil, geotechnical, and environmental engineering. Langan site/civil engineering services included site demolition, grading, drainage, erosion and sediment, utilities and construction details to support the building projects and the east campus landscape enhancement project. Geotechnical services included conducting subsurface investigations including borings and test pits, a geotechnical report and design support for the preparation of foundation documents for three new buildings and site improvement.

AWARDS
2015 AIA New York State Design Award, Merit of Design: Commercial/Industrial Large

Location
East Hanover, NJ

Client
Novartis Pharmaceutical Corporation

Services
Site/Civil
Geotechnical
Environmental
Landscape Architecture

Architect
Gensler


Biotrial North American Headquarters

OVERVIEW
Langan provided geotechnical, civil, environmental, traffic, and landscape architecture services to this France-based biotechnology and pharmaceutical company. The first phase of the project consisted of a five-story, 70,000-SF glass building, which features metal panels that rise on two sides of the building, symbolizing the nature of Biotrial's pharmaceutical testing mission. Phased site design construction plans include a screened-in service and parking area with underground stormwater storage, a public plaza at the front of the building that will carry the building pattern toward the public sidewalk, and a private volunteer garden that will provide a green resting area for building users.

Location
Newark, NJ

Client
Biotrial

Services
Geotechnical
Site/Civil
Traffic & Transportation
Landscape Architecture

Architect
Francis Cauffman

Strategic Partners
Buro Happold
Thornton Tomasetti


Allergan Headquarters – Parking Garage

OVERVIEW
5 Giralda Farms is a 463,000-SF Class A commercial office building located within the beautiful Giralda Farms campus, which was formerly the estate of Geraldine Rockefeller Dodge. As part of the re-tenanting of the office building in 2016, Langan assisted the owner to plan, design and permit additional parking at the facility to meet the needs of the tenant, Allergan. We worked with the project team to plan and design a parking facility that fit within the unique character of the campus while protecting significant historical landscape features. To meet the strict sustainability requirements of the Giralda campus we included bioretention basins, swales and porous pavement measures, and designed a stormwater management system.

Location
Madison, NJ

Client
Lincoln Equity Group, LLC

Services
Site/Civil
Geotechnical
Traffic & Transportation
Surveying/Geospatial
Natural Resources & Permitting

Architect
HLW


Bell Works – Former AT&T Bell Laboratories

OVERVIEW
Bell Works is a reimagination of the former Bell Labs building, encompassing 2-million SF of space for offices, retail, dining, and hospitality. Designed by architect Eero Saarinen in 1962, the landmarked building previously functioned as a research and development facility for Bell Laboratories and as the headquarters for AT&T. Langan supported the redevelopment of the 473-acre site, including the design of new entrances, lighting, and landscaping, as well as natural resources permitting and field observation during construction of the entrances. We also managed the regulatory permitting, obtaining local approvals from the Holmdel Planning Board and Soil Conservation District.
AWARDS
2024 ULI Northern New Jersey, Excellence Awards: Long-Term Adaptive Reuse

Location
Holmdel, NJ

Client
Somerset Development

Services
Site/Civil
Environmental
Surveying/Geospatial
Traffic & Transportation
Natural Resources & Permitting
Landscape Architecture

Architects
Mancini Duffy
Alexander Gorlin & Associates


Oracle

OVERVIEW
Langan performed a geotechnical investigation for the Oracle Headquarters and the adjacent Island Parkway Campus. Langan developed foundation design criteria for several office buildings, a recreation center, conference center, pedestrian bridge, and four parking structures.

Location
Redwood City, CA

Client
Oracle

Service
Geotechnical

Architects
Gensler
KSH Architects

Strategic Partners
Nishkian Menninger
Webcor


Gateway of Pacific

OVERVIEW
Langan is providing multi-disciplinary services for Phase I of Gateway of Pacific — a 1.3-million-SF laboratory and office campus development. Phase I includes the construction of a 12-story building with a basement and penthouse that includes two wings connected by a 5-story atrium; a 2-level below-grade parking garage; an amenity building above the parking garage; surface parking and associated grading; and landscaping and other improvements. Our geotechnical team is charged with evaluating the subsurface conditions and providing foundation and grading recommendations for the development and improvements. Langan consulted on the conceptual design phase and is now providing construction observation services for Phase I. Our environmental team performed site characterizations to assess the potential for the presence of hazardous substances by analyzing soil and groundwater samples.

Location
South San Francisco, CA

Client
BioMed Realty

Services
Geotechnical
Environmental

Architect
Flad Architects


NJIT – Integrative Science and Engineering Laboratory

OVERVIEW
This new 4-story, 24,500-SF state-of-the-art research facility will include wet and dry laboratories, offices, and teacher and student space. Langan provided site/civil, geotechnical and environmental engineering, and surveying services for the new building. Additionally, Langan laser scanned the existing building and created a Revit model for the architect to use for their design, resulting in a more seamless design and construction process. We also provided geotechnical and environmental engineering support services during construction of the facility.

Location
Newark, NJ

Client
New Jersey Institute of Technology

Services
Site/Civil
Geotechnical
Traditional Surveying
Terrestrial Scanning/BIM
Environmental

Architect
NK Architects


NJIT – Joel & Diane Bloom Wellness & Events Center

OVERVIEW
Langan provided geotechnical and environmental engineering and surveying services for this new $100-million multipurpose event and fitness center. The 200,000-SF building will be the centerpiece of the university and provide a much needed hub for conferences and events, fitness and team sports practice areas, and student study and gatherings. Langan provided preliminary environmental field investigation for areas of the build site that was formerly occupied by an auto body facility. We also provided LSRP services for the review and remediation of any areas of concern. Langan is currently providing geotechnical and environmental engineering support services during construction.

Location
Newark, NJ

Client
New Jersey Institute of Technology

Services
Geotechnical
Environmental
Surveying/Geospatial

Architect
AECOM


Jack and Sheryl Morris Cancer Center

OVERVIEW
The Rutgers Cancer Institute of New Jersey is the state’s first National Cancer Institute-designated comprehensive cancer center. The state-of-the-art, 510,000 SF Cancer Pavilion is a one-stop destination for cancer patients, providing laboratory services, an outpatient clinic, an infusion and chemotherapy suite, and radiation oncology. Langan provided stormwater management, utility design, and permitting services for the project, including Soil Erosion and Sediment Control Certifications, Treatment Works Approvals, and Water Main Extension Certifications.
AWARDS
2022 NAIOP NJ Deal of the Year, Transformation Award
2022 NAIOP NJ Deal of the Year, Finalist - Mixed-Use

Location
New Brunswick, NJ

Client
New Brunswick Development Corporation

Services
Site/Civil
Geotechnical
Environmental
Landscape Architecture
Surveying/Geospatial
Traffic & Transportation

Architect
HOK

Strategic Partners
AKF Group
O'Donnell & Naccarato
THA Consulting


Rutgers University – Richard Weeks Hall of Engineering


By combining the design for the adjacent road and regional stormwater basin with the Weeks Hall project, Langan was able to reduce construction costs by sharing stormwater management facilities and minimizing utility relocations.


measurable value

Early in the design process, Langan identified critical issues that needed to be addressed prior to construction of Rutgers University Richard Weeks Hall of Engineering. These critical issues included regional stormwater management planning, site circulation, utility relocations, permitting constraints, and replacement of on-site parking.

Langan’s regional stormwater approach not only addressed the current needs of the project, but also supports future developments within the 30-acre drainage area on Busch Campus. The new roadway adjacent to the building, which will be a part of a future campus loop, will provide vehicular circulation at the perimeter of the campus while limiting pedestrian and vehicular conflicts in the center of the campus.

By combining the design for the loop road and regional stormwater basin with the Weeks Hall project, Langan was able to reduce construction costs by sharing stormwater management facilities and minimizing utility relocations.

 

overview

Weeks Hall was designed to provide a state-of-the-art interdisciplinary facility designed to anchor the School of Engineering on the Busch campus and serve as a gateway for the next generation of engineers. The facility will feature smart classrooms and laboratory spaces, collaborative work space, dedicated student space, and advanced technology integration. Langan provided land-development engineering, utility design, soil erosion and sediment control permitting, geotechnical engineering, traffic engineering, environmental engineering, surveying services, and natural-resources permitting services on this challenging project.

Location
Piscataway, NJ

Client
Rutgers University

Services
Site/Civil
Geotechnical
Traffic & Transportation
Surveying/Geospatial
Environmental

Architect
The S/L/A/M Collaborative


Rutgers University – The Yard @ College Avenue

OVERVIEW
Located in the heart of the Rutgers New Brunswick campus, The Yard @ College Avenue is a 14-story, mixed-use dormitory complex providing housing for approximately 450 students. The building’s U-shaped design provides space for a 25,000 SF public courtyard, which includes commercial space, a shore-style boardwalk, and a large video monitor to broadcast sporting events, newscasts, and movies throughout the school year. Langan provided site layout, stormwater management, and utility design; coordinated with local and state agencies; provided permitting support; and prepared a traffic report that identified potential impacts on the college’s main thoroughfare.

Location
New Brunswick, NJ

Client
New Brunswick Development Corporation (DEVCO)

Services
Site/Civil
Traffic & Transportation

Architect
Elkus Manfredi Architects


RWJ University Hospital – East Tower

OVERVIEW
Langan provided surveying, geotechnical, site/civil, and traffic engineering services for the RWJ East Tower, which includes nine stories of parking with two floors of office space. The project provided the hospital with over 700 additional parking stalls for patients and staff. Langan provided multi-discipline engineering services for the project including 3D laser scanning of the adjacent hospital buildings and a full intersection design for the new garage entrance.

Location
New Brunswick, NJ

Client
RWJBarnabas Health

Services
Site/Civil
Geotechnical
Surveying/Geospatial
Traffic & Transportation

Architect
NK Architects

Strategic Partner
O'Donnell & Naccarato (Structural)


RWJ University Hospital – Ambulatory Building Expansion

OVERVIEW
Langan is currently providing site/civil, surveying, and traffic engineering services for the Ambulatory Building expansion. The project will include the construction of 8,000 SF of new medical office space and the renovation of 38,000 SF of existing hospital space. In addition, the project will provide site improvements to accommodate new ambulance parking and emergency patient drop-offs.

Location
New Brunswick, NJ

Client
RWJBarnabas Health

Services
Site/Civil
Traffic & Transportation
Traditional Surveying
Terrestrial Scanning/BIM

Architect
Array Architects


RWJ University Hospital – South and Core Building Expansion

OVERVIEW
Langan is currently providing site/civil, surveying, and traffic engineering services for the South and Core Building expansions. The project will add a new floor to the RWJUH Core Building and will horizontally expand the RWJUH South Building. Construction of the project will include the addition of 40,000 square feet of new hospital space and the renovation of 85,000 square feet of existing hospital space. In addition, the project will provide parking for non-emergency ambulances.

Location
New Brunswick, NJ

Client
RWJBarnabas Health

Services
Site/Civil
Traffic & Transportation
Surveying/Geospatial

Architect
Array Architects


HUMC – Helena Theurer Pavilion

OVERVIEW
The Helena Theurer Pavilion is a nine-story, 530,000 SF surgical and intensive care “smart hospital.” The facility incorporates innovative technology into a thoughtfully designed space to provide an enhanced, collaborative atmosphere for patients, physicians, and medical staff. Langan assisted with site improvements associated with the development, including an internal circulation driveway, walkways, retaining walls, utilities, and stormwater management. We also completed a full site survey, 3D scan of the interior and exterior of existing buildings, and an existing conditions BIM model. The design team used the BIM model for building placement, site and utility connections, and design.
AWARDS
2024 ULI Northern New Jersey, Excellence Awards: Healthcare/Medical
2023 ENR New York, Best Projects: Health Care

Location
Hackensack, NJ

Client
Hackensack Meridian Health

Services
Site/Civil
Geotechnical
Environmental
Landscape Architecture
Traffic & Transportation
Surveying/Geospatial

Architect
RSC Architects

Strategic Partners
Turner Construction Company
WM Blanchard


HUMC – Emergency Trauma Department Expansion

OVERVIEW
The Hackensack University Medical Center (HUMC) is proposing to expand the Emergency Trauma Department (ETD) located at the hospital main campus in Hackensack, NJ. Site improvements associated with the ETD expansion consisted of a new 7,750-SF infill building addition, reconfiguration of the access drives servicing the emergency room ambulance drop-off area, and widening a roadway to provide an ambulance staging area and police / emergency vehicle parking area. Langan coordinated extensively with the project architect and client during the design process. The HUMC timeline was considered a fast track process; since Langan performed several disciplines in house, we were able to expedite the design process. 

Location
Hackensack, NJ

Client
Hackensack Meridian Health

Services
Surveying/Geospatial
Site/Civil
Geotechnical
Traffic & Transportation

Architect
Pomarico Design Studio

Strategic Partner
Gilbane Building


Montclair State University – The Heights

OVERVIEW
The first “Public Private Partnership” enabled by the New Jersey Economic Stimulus Act of 2009, this $200-million project is privately financed and adds 2,000 new beds and 24,000 SF of dining capacity on Montclair State University’s campus. This particular site was a rock quarry and posed many design challenges including steep slopes and shallow rock. Design had to accommodate a very aggressive schedule and budget goals as well as maintaining active utilities and roadways. Langan performed a site-specific shear wave velocity test which allowed the site classification to be upgraded. The result of the upgrade resulted in a 10% saving of the building superstructure cost. This project received LEED Silver certification by the USGBC.

AWARDS
ACEC NJ Engineering Excellence Award

Location
Little Falls, NJ

Client
Montclair State University

Services
Geotechnical
Site/Civil
Surveying/Geospatial
Environmental
Natural Resources & Permitting

Architect
Design Collective Architecture (Design)

Strategic Partner
Capstone Companies


Montclair State University – Center of Environmental and Life Sciences

OVERVIEW
The Center of Environmental and Life Sciences (CELS) Building is a five-story, 107,500 SF building situated in the southeast portion of the Montclair State University Campus. The project involved the demolition of McEachrern Hall and relocation of numerous utilities prior to constructing the new building. Langan provided a complex utility coordination and design between the new building and the future campus wide steam and chiller system. There were also numerous utility relocations and utility demolition necessary to install the CELS building.  This project received LEED Silver certification by the USGBC.

AWARDS
USGBC NJ - Honorable Mention: Sustainable Schools

Location
Little Falls, NJ

Client
Montclair State University

Services
Site/Civil
Natural Resources & Permitting

Architect
SLAM Collaborative, Inc.