Langan Qualifications – Siemens

Lincoln Centre Life Sciences Research Campus

OVERVIEW
Located on the Peninsula, Lincoln Centre is a 595,000-SF biomedical and life sciences research campus redevelopment. The buildings of the former industrial park were demolished. The development now includes three office/laboratory buildings, three parking structures, and an amenities building. Langan performed a geotechnical investigation and site-specific seismic studies, updated the Phase I Environmental Site Assessment, conducted a Limited Environmental Site Characterization, and provided construction observation and analytical testing services.

Location
Foster City, CA

Client
BioMed Realty

Services
Geotechnical
Environmental
Earthquake/Seismic

Architect
HOK


JP Morgan Chase Data Center

OVERVIEW
Langan provided complete geotechnical, site/civil, and survey services for this data center, which consisted of renovating an existing 90,000-square-foot, two-story office building; constructing a new 40,000-square-foot building addition; and installing underground water storage tanks, back-up generators, and above-grade electrical substations.

Location
Carlstadt, NJ

Client
Highland Associates

Services
Site/Civil
Geotechnical
Earthquake/Seismic
Traditional Surveying

Strategic Partner
Thornton Tomasetti


University of Miami – Converge Miami

OVERVIEW
The research and development park provides office and laboratory space for companies to collaborate with UM researchers, making it easier to turn scientific discoveries into commercial products. The 1.4-million SF research and development complex includes multiple mid-rise buildings and associated parking structures. Langan prepared paving, grading, and drainage plans to expand the surface parking field and obtained a “Drainage Connection Permit” from the Florida Department of Transportation (FDOT), which was required because the project abuts an FDOT-operated roadway. We also performed a geotechnical exploration to evaluate the subsurface conditions, spearheaded the pile load test program, and conducted earthwork monitoring and testing, which was complicated by environmental impacts in the soil and groundwater. Our detailed evaluation of excavated materials allowed for the reuse of materials as structural fill and pavement base course. This avoided the need for imported fill, resulting in considerable cost savings.

Location
Miami, FL

Client
Wexford Science and Technology

Services
Site/Civil
Geotechnical

Architect
Zimmer Gunsul Frasca

Strategic Partner
Whiting Turner


Texas Instruments Corporation

OVERVIEW
Langan has worked on various Texas Instruments Corporation sites managing groundwater monitoring programs, designing and implementing remedial programs and working with regulatory agencies towards site closures.

Location
Palo Alto & Santa Clara, CA, & Puyallup, WA

Client
Texas Instruments Corporation

Services
Environmental
Site/Civil


Tallahassee Renewable Energy Center

OVERVIEW
Biomass Gas & Electric is proposing to construct a biomass-fueled electrical generating power plant on an approximately 23-acre site in a geologically karst sensitive area. The site contains wetlands, a high voltage transmission line, and a significant grade change. Langan provided site/civil engineering, geotechnical engineering, environmental engineering, natural resources and associated permitting services. Langan designed the site to accommodate the most efficient use of the land for the power plant while avoiding impacts to wetlands and balancing earthwork.

Location
Tallahassee, FL

Client
Biomass Gas & Electric

Services
Site/Civil
Geotechnical
Environmental
Natural Resources & Permitting


UCHC Outpatient Pavilion and Parking Garage

OVERVIEW

The UCHC Ambulatory Care Complex is a design-build project with an aggressive delivery schedule. The project includes a 300,000 square-foot medical building and six-story parking garage. Langan is providing engineering, environmental permitting and surveying services. Site challenges include existing wetlands that require filling, a mass excavation over more than 70 feet in some areas, a need for flood management verification, and significant utility upgrades and reconfigurations on an active health care campus. The site design will incorporate environmentally sensitive stormwater techniques and the team is seeking LEED Silver certification for the project.

AWARDS
  • 2016 Connecticut Building Congress Project Team Award – First Place for New Construction

Location
Farmington, CT

Client
Fusco/Clark – a Joint Venture

Services
Site/Civil
Environmental
Traditional Surveying


Hudson Yards Redevelopment

OVERVIEW
This major New York City rezoning and redevelopment, led by Related/Oxford, under the joint guidance of New York City, the Metropolitan Transportation Authority, Hudson Yards Development Corporation, and New York State, is reinventing the once barren west side of Midtown Manhattan. Upon full completion, the site will include more than 18 million square feet of commercial, retail, and residential towers, 14 acres of open park space, a cultural venue, a public school, and a luxury hotel all built over active rail yards.

Location
New York, NY

Client
Hudson Yards, a Related Oxford Venture

Services
Geotechnical
Environmental
Site/Civil
Traffic & Transportation
Traditional Surveying
Terrestrial Scanning/BIM

Architects
Kohn Pedersen Fox
Skidmore, Owings & Merrill
Diller Scofidio + Renfro
Ismael Leyva Architects
Rockwell Group

Strategic Partners
Thornton Tomasetti
WSP


3D Visualization of Comingled Chlorinated Solvent Plumes

OVERVIEW
Langan provided 3D visualization analysis of the hydrogeologic framework and contaminant transport at a former industrial facility in New Jersey. The site was characterized by a large and dilute chlorinated solvent plume that has migrated 5,300 feet within a fractured bedrock aquifer. Multiple off-site sources also contributed dissolved solvents to the comingled plume. Environmental Visualization Studio (EVS) software was utilized in order to gain a better understanding of contaminant transport in the fractured and faulted bedrock aquifer. EVS software uses advanced gridding and geostatistical analysis to create 3D models of geologic setting and analyte spatial data.

Location
Confidential Site, NJ

Client
Confidential

Service
Data Management


Panasonic North American Headquarters

OVERVIEW
This 12-story, 340,000-SF high-end office building occupies a portion of a former below-grade parking structure. Langan's services included site/civil engineering, boundary and topographic surveying, traffic engineering, landscape architecture, natural resources, and geotechnical engineering. A major project challenge was the design of a 400-space parking lot, which required substantial coordination with the existing FBI complex. The building is the first of its kind in Newark, obtaining LEED Gold certification for the core and shell, as well as LEED Platinum certification for the interior.

Location
Newark, NJ

Clients
SJP Properties
Matrix Development

Services
Site/Civil
Geotechnical
Traffic & Transportation
Natural Resources & Permitting
Landscape Architecture
Traditional Surveying

Architects
Gensler
HLW


Mercedes-Benz Stadium

OVERVIEW
Langan was retained as the environmental and geotechnical engineer of record for Mercedes-Benz Stadium, home of the Atlanta Falcons. The 1.8-million-SF multi-purpose, 71,000-seat retractable roof stadium opened for the 2017 NFL Season. As the geotechnical and environmental consultant on the project, Langan continued its role throughout construction by providing asbestos abatement oversight, monitoring and testing of excavated soils to comply with the environmental soils management plan, underground storage tank closure management, storage tank closure assessments, vibration monitoring within the Marta Tunnel structure and geotechnical oversight of various foundation and ground improvement systems.

Location
Atlanta, GA

Client
Darden & Company

Services
Geotechnical
Environmental

Architects
HOK (360 Architecture)
Goode Van Slyke Architecture
Stanley Beaman & Sears
tvsdesign

Strategic Partner
ICON Venue Group


Former Gas Plant Remediation & Ecological Restoration

OVERVIEW
Langan developed and gained regulator agreement on a final remedy for a former major oil corporation gas plant site located in Southern California. The agreed upon path to closure utilized a background analysis and risk assessment to identify attainable remedial cleanup standards for constituents of potential concern. By taking a face-to-face approach with regulators (DTSC, Region 9 EPA, Central Coast RWQCB, County of Santa Barbara) and presenting a strong argument for a risk-based strategy to closure, Langan was able to achieve an agreed upon 1 to 2 year path to closure that was 27 years (case opened in 1988) in the making with two previous consultants.

Location
Santa Barbara, CA

Client
Confidential

Service
Environmental


Zuckerberg San Francisco Hospital & Trauma Center

OVERVIEW
The Zuckerberg San Francisco General Hospital and Trauma Center is the only Level One trauma center serving 1.5 million people in the region. It is also the only hospital in San Francisco built with a base-isolated foundation, the latest technology for protecting buildings during seismic activity.The 10-story public hospital (8 stories above and 2 stories below ground) was constructed in an open space area next to the administrative, outpatient, and acute-care hospital buildings. Both hospitals are now connected via a pedestrian bridge and underground utility tunnel. Langan provided geotechnical and earthquake/seismic consulting services for the project.

AWARDS
2016 Engineering News Record California Best Projects, Healthcare Best Project

Location
San Francisco, CA

Clients
City and County of San Francisco
BCM-SAR Divisions

Services
Geotechnical
Earthquake/Seismic

Architect
Fong and Chan


Gas Compressor Stations

OVERVIEW
Langan provides integrated services to multiple clients for compressor station sites. As a part of assessing site feasibility, the Langan team provides site layout and grading analyses along with stream and wetland delineations. After site selection, final construction documents are prepared by Langan including site layout, grading and drainage design, erosion and sediment control, and stormwater management design. Additionally, our geotechnical team evaluates subsurface conditions and our transportation team permits driveways and access roads. Langan also obtains air quality permits and other environmental compliance permits.

Location
Multiple Locations

Client
Confidential

Services
Site/Civil
Geotechnical
Natural Resources & Permitting
Environmental Compliance


Fulfillment Center – Windsor

OVERVIEW
Langan provided multiple services to KTR Capital for the development of a 1.3-million-SF distribution warehouse in Windsor, Connecticut. Langan worked closely with the town to develop an entitlement schedule to meet the project's aggressive requirements, which included public outreach to neighbors, a public hearing for work within the upland review area, a text amendment for parking, public hearing for subdivision, and site plan approval. The project also required a Major Traffic Generator Certificate from the Office of State Traffic Administration. Additionally, Langan provided traffic engineering, utility design, stormwater management design, landscape and lighting design, and due diligence services.

MD Anderson Cancer Center at Cooper University Hospital

OVERVIEW
Langan is supporting the multi-story, 103,000-SF world-class cancer institute. The design includes a public plaza and garden, and a renovated landscape. The project has undergone extensive conceptual planning, programming, and site planning studies to locate the facility on an extremely tight urban site. Stormwater runoff from the proposed site was minimized by reducing the amount of on-site surface parking in favor of a heavily landscaped plaza space.

AWARDS
2013 US Green Building Council New Jersey, Emerald Award - Urban Green Project
2013 American Council of Engineering Companies, Diamond Award

Oracle

OVERVIEW
Langan performed a geotechnical investigation for the Oracle Headquarters and the adjacent Island Parkway Campus. Langan developed foundation design criteria for several office buildings, a recreation center, conference center, pedestrian bridge, and four parking structures.

Location
Redwood City, CA

Client
Oracle

Service
Geotechnical

Architects
Gensler
KSH Architects

Strategic Partners
Nishkian Menninger
Webcor


InterActiveCorp (IAC) Headquarters Building

OVERVIEW
Langan's integrated services helped overcome numerous technical challenges that ultimately transformed a former manufactured gas plant site into an iconic structure on the Hudson River.

AWARDS
2008 American Council of Engineering Companies New York, Engineering Excellence Award, Platinum

Location
New York, NY

Client
The Georgetown Company

Services
Geotechnical
Site/Civil
Environmental

Architects
Frank Gehry Architect
Adamson Associates

Strategic Partner
DeSimone Consulting Engineers


NJ Meadowlands Commission 1-A Landfill Solar Array

OVERVIEW
The solar array will be constructed on the top of the landfill and down the southern slope of the New Jersey Meadowlands Commission (NJMC) 1-A Landfill, with an intertie connection to the regional electrical distribution located off the site. The solar array is expected to provide over 3 MWdc of electric solar power annually. Langan has been retained by SunDurance to assist in a variety of design, permitting, and construction needs.

Location
Kearny, NJ

Client
SunDurance Energy (Subsequently purchased by PSE&G for Solar 4 All Program)

Services
Site/Civil
Geotechnical
Environmental
Natural Resources & Permitting


US Embassy Compound Morocco

OVERVIEW
The new embassy compound includes main and service compound access control structures, a new office building with basement, marine security guard quarters, perimeter walls, and a parking garage. Important design parameters included incorporating specific Department of State and local agency requirements. Langan provided the necessary site/civil, environmental, and geotechnical engineering services to prepare design plans and written reports for approval by the Department of State's OBO department and local review agencies.

Location
Rabat, Morocco

Clients
U.S. Department of State
Office of Overseas Building Operations
SmithGroup, Inc.

Services
Site/Civil
Geotechnical
Environmental


UH Clear Lake – Recreation & Wellness Center

OVERVIEW
The University of Houston Campus Recreation and Wellness Center was developed as part of the University’s transition from a commuter campus for upper level and graduate courses to a dynamic home for undergraduate students. Langan provided site/civil design services for the 81,000 SF building, including grading; coordination with structures and site utilities; water, sewer, and stormwater connections; and drainage and detention design. We also participated in the utility master plan design and helped coordinate the concurrent construction of this building and two other facilities on the north side of campus.
AWARD
2019 The Chicago Athenaeum, American Architecture Award

Location
Clear Lake City, TX

Client
University of Houston–Clear Lake

Service
Site/Civil

Architect
SmithGroup